Engineering

London Road Safety Unit

TLRN engineering

Results

Traffic across Tower Bridge

The table below shows the number of road safety engineering schemes implemented on the TLRN since 2001.

Before and after collision data along with a percentage change in collisions is also shown. Before and after figures are for up to 36 months from implementation.

Engineering schemes
Area Number
of schemes
Collisions
before
Collisions
after
% change
Central 130 2623 1824 -30
North 68 1575 1105 -30
South 72 1196 870 -27
Total 270 5394 3799 -30